Some Pic.'s of the build.
2 posters
Re: Some Pic.'s of the build.
So after doing a SYE for JB's new XJ build
then building Sean a t-case for his XJ today
I got to work on my shit.
I got the upper link mount's done expect for trimming
the corner of the frame plate
My buddy Scourge brought me the
fresh rebuilt yota ifs steering box that's drilled and taped with hose's
and an 8" ram off his yota ( He's going full hydro) for my steering setup.
plan is tomorrow to get the body tub
from the house to the Lilly pad an get it cut and
back on the frame.
then building Sean a t-case for his XJ today
I got to work on my shit.
I got the upper link mount's done expect for trimming
the corner of the frame plate
My buddy Scourge brought me the
fresh rebuilt yota ifs steering box that's drilled and taped with hose's
and an 8" ram off his yota ( He's going full hydro) for my steering setup.
plan is tomorrow to get the body tub
from the house to the Lilly pad an get it cut and
back on the frame.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
I got the rear link all most finished just have
some clean up grinding to do.
Some more test flexing. 25" under the tire with
still more travel in it.
Than's to Eric, Sean and Mark.
we got the tub back to the Lilly pad.
The biggest dent in the tub.
So 30 min. later I cut the bitch in two.
Think I keep the dent so the tailgate's going back on.
some clean up grinding to do.
Some more test flexing. 25" under the tire with
still more travel in it.
Than's to Eric, Sean and Mark.
we got the tub back to the Lilly pad.
The biggest dent in the tub.
So 30 min. later I cut the bitch in two.
Think I keep the dent so the tailgate's going back on.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
With gettin the Mater ready for Joes for
the labor day run I didn't work on this
thing much last week.
Put some XJ rear spring's in the front for mock up today.
102" wheel base.
the labor day run I didn't work on this
thing much last week.
Put some XJ rear spring's in the front for mock up today.
102" wheel base.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Needed the tranny out of the old sami
Didn't feel like laying on the ground so
I pulled it out the top.
Diggin my way to it.
Think I can get to it now.
Didn't feel like laying on the ground so
I pulled it out the top.
Diggin my way to it.
Think I can get to it now.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Time for tube work.
Picked up three stick's of 1-3/4" dom tubing today.
Damn I need a trailer.
Picked up three stick's of 1-3/4" dom tubing today.
Damn I need a trailer.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Started bending tube today.
Found this cage pic. I like so I'll do some thing close to this
Found this cage pic. I like so I'll do some thing close to this
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Here's a pic. of one of the b- hoop's.
It's just set up there for the pic.
There's 11 bend's in this and then I had
to make a copy of it for the double b-hoop
set up talk about a pain in the ass.
It's just set up there for the pic.
There's 11 bend's in this and then I had
to make a copy of it for the double b-hoop
set up talk about a pain in the ass.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
First I'd like to thank AK for letting me borrow his bender.
Got started on the tube work this weekend.
Got the double B-hoop's and some of the back half done today.
Tomorrow I should get the air shock mount's bent and get the shock's
mounted and add gusset's to what I've got so far.
Got started on the tube work this weekend.
Got the double B-hoop's and some of the back half done today.
Tomorrow I should get the air shock mount's bent and get the shock's
mounted and add gusset's to what I've got so far.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Well time to get back on the POS.
Got the tub welded together and the bondo work done.
Tub's bolted on and some body part's hung to get a look at it.
Settin at full comp. at 102" wheel base.
Got the tub welded together and the bondo work done.
Tub's bolted on and some body part's hung to get a look at it.
Settin at full comp. at 102" wheel base.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19
Re: Some Pic.'s of the build.
Did a little more on this.
Put the t-case in and got a mock up rear drive shaft made.
Did a little more of the body work on the cowl area
where the vent was bent a little.
Put the t-case in and got a mock up rear drive shaft made.
Did a little more of the body work on the cowl area
where the vent was bent a little.
Zukidave- Admin
- Posts : 252
Join date : 2009-08-19